FINISH SELECTION, REIMAGINED
Finishes should
be fun.
FinishKit turns your floor plans into a live, visual finish schedule your clients actually want to use.
No credit card required
HOW IT IS
RE: RE: RE: RE: Final Finish Selections v3_FINAL
From: karen.m@designstudio.com
CC: jt@builder.co, sarah@archfirm.com, mike.p@tile.supply, accounting@designstudio.com, client@...
Per my last email, the client has NOT approved the beige. Please do not order until we have sign-off. Also the tile sample photo won't load on my end???
I thought we agreed on the blue? That's what's in v5 of the schedule. Please advise ASAP, framing starts Monday.
Actually the client changed their mind to beige. Updated schedule attached (see v7). Can someone confirm the tile is compatible?
Which version are we on now? I have v3 and v5. The tile in v3 was discontinued last month btw.
Attaching the original selections. Let's try to nail this down this week please.
HOW IT SHOULD BE


Same room. Two options. One click.
THE PROBLEM
Your finish schedule is bleeding your firm dry.
For a 3-person firm doing 5 projects a year, documentation errors drain $50K–$100K annuallyin rework, change orders, and unbillable coordination time — up to a third of your net profit.
40%
of your fee goes to construction documents — not design. On a $50K fee, that's $20K per project spent on paperwork.
AIA
5.5 hrs
per person, per week — spent hunting for specs and revised drawings instead of designing.
PlanGrid / FMI
$3,200
in RFI costs per project when finish conflicts slip through. Each one adds 10 days of delay.
Navigant
“You open Excel, spend hours resizing columns, searching for product specs, pasting in photos and trying to get everything to line up.”
— Industry survey
“We had spreadsheets across so many different computers and online resources, making updates complicated and messy.”
— Austin Carrier, Principal Designer
“The spec calls for one finish, the elevation shows another, and the interior finish schedule calls for a third.”
— Construction Specifier
HOW IT WORKS
Four steps. Zero spreadsheets.
Upload your plans
Drag in your PDF plans and Excel finish schedule. That's it.
AI places every finish
FinishKit reads your schedule, identifies rooms, and places every item on the correct plan.
Share with your client
Send a single link. Your client sees every finish, in context, on the plan.
Swap finishes live
Your client picks alternatives, you approve. Changes update everywhere instantly.
THE CLIENT EXPERIENCE
Your clients will
actually enjoy this.
Calacatta Gold Marble
Honed · 24×24 · Kitchen island
Visual, not verbal
Clients see their finishes on their actual floor plan — not in a spreadsheet row.
Fewer misunderstandings
When clients can see context, they make better decisions faster.
Fun to explore
Tap a dot, see the material. Compare options. Approve in one click.
INTEGRATIONS
Works with your tools.
Replaces none of them.
PRICING
One plan. Everything included.
per firm · billed monthly
- Unlimited projects
- Unlimited clients & collaborators
- AI-powered finish placement
- PDF plan rendering
- Real-time client sharing
- Excel & CSV import
- Priority support
No credit card required · Cancel anytime